First Floor Timber Floor Construction Methods

The standard method is to lay sheets of polystyrene or similar above the ground floor and then lay a screed or a timber floor over.
First floor timber floor construction methods. A neat alternative with a timber joisted floor is to put 50mm timber battens on top of your floor deck at 400mm centres lay your underfloor heating pipes between the battens clip them to the deck and then cover with a lean mix screed. If plywood or osb board is used that does not have tung and grove configuration then blocking should be installed between the floor joists where edges meet and the end joints should be staggered. Flooring is the general term for a permanent covering of a floor or for the work of installing such a floor covering. Some newer homes have manufactured i beam shaped joists.
The ends of these timber joists are built into or suspended by joist hangers from the external walls of the property. A lot of variety exists in flooring and there are different types of floors due to the fact that it is the first thing that catches your eye when you walk into a house as it spans across the length and. Ground floor hollow or timber floor hollow floors also known as suspended or timber floors are simply timber joists suspended across and supported by load bearing walls under the floor. Floor joists are typically 2 by 8s 2 by 10s or 2 by 12s.
A floor s framework is made up mostly of wooden joists that run parallel to one another at regular intervals. Ceiling joists are usually 2 by 6s or sometimes 2 by 4s if it is an older home. You can then fit a thin plywood layer over the top to regulate your final floor finish.